22 March 2026

More ceiling work

This is actually a summary of two weeks’ worth of work. I didn't get around to blogging about it after one week. And then these two weeks, a fair amount of progress has been made making the downstairs bedroom ceiling look like a ceiling again, and less like a building site. We're leaving the little hall by the front door for now, as in the long run I also want an electric shower fitted, and the plumbing and wiring for that might have to go through the ceiling as well. No use putting a lot of effort in a ceiling that will be destroyed in a few months’ time again!

This round was basically entirely done by Neil. I did other chores while he worked on the ceiling. I didn't want to get in his way, or compete with him for things such as pallet knives and filler. I'm not even sure what I did the first weekend when he attacked the ceiling, but the second weekend I attacked the big gap in the wall in the living room, where you looked right at the repaired water pipe in the wall. Neil had suggested I first pack it with food or plywood or something, and then put filler over the top. So I started doing that. And I got quite far with it!

There is still a heck of a lot of work to do, but it's nice to see progress. And the ceilings will never look the way they looked in the beginning, but I'm sure we'll get them looking acceptable in the end!

The big work in the bedroom

Small holes getting inconspicuous 

Gash in living room wall having been packed



No comments: